We have our own micro trenching dry cut machine and also the facilities for performing fibre blowing. The scope of works we are covering are as follows;
Fiberization of DBKL Traffic System
2002 - Installation of blown fibre tubing 4" duct embeded in both North & South-bound tracks for KL Monorail (Optoprova Sdn Bhd)
2010 - Design, supply, install, test and commissioning of outside plant network (Fiber To The Premise) pilot project using Blown Fiber Technology (Maxis)
2009 - Supply, Install and Commissioning of DSX Chasis, BALUN panels, rack and fuse panels.
2016 - Equipment room and grounding installation for Malaysia-Cambodia-Thailand Submarine Cable Project, Telekom Malaysia.